Pin tasks during construction (#98688)
I got a failure in CI for the stress test that pointed to this as the cause. During construction, since the task has no references to it, it can be collected. Setting the transient ref prevents this bad case from happening. @lukesandberg I'm going to work on the gc at each suspend point in a follow up PR.
Showing
Please
register
or
sign in
to comment