[ci] Disable mid-stack PR optimization for native PR stacks (#95427)
https://vercel.slack.com/archives/C04KC8A53T7/p1783018076576349 <img width="1015" height="347" alt="Screenshot 2026-07-02 at 11 57 05 AM" src="https://github.com/user-attachments/assets/74d99079-d165-435a-aece-161862795ef6" /> If we're in the middle of a stack, but the PRs below us in the stack are already merged, we should not skip CI jobs. This logic isn't smart enough to handle that.
Showing
Please
register
or
sign in
to comment